During the first two weeks after launch the folded observatory was transformed into its operating configuration.
The sunshield pallets, the deployable tower, the mid-booms and the five membrane layers were deployed over eight days, and tensioning of the final layer was completed on 4 January 2022 [4]. The team briefly paused operations to optimise the power system and tensioning motors before the layers were tensioned [4].
The secondary mirror support structure and the two side wings of the primary mirror were then deployed; on 8 January 2022 the observatory was fully deployed [3]. On 24 January 2022 a burn of nearly five minutes inserted Webb into its orbit around L2 [5].